Aksha
Aksha
Business Software

Documentation

Per Diem Rates

Per Diem Rates provide governed daily allowance components that employee claims snapshot and calculate by travel date, day type, overnight use and meal deductions.

Expense administratorsFinance teamsTravel administrators
Last updated: 01-09-2026

Purpose

Use Per Diem Rates for standardized daily travel allowances rather than manually entering an arbitrary claim total.

Save and Close

Save validates the Per Diem Rate and returns to the list. Close leaves the record without performing a new save.

Use effective dates and Active status to control when a rate should be selected for new claims.

Per Diem Rate fields

FieldMeaning
Rate Code / NameStable identity and readable rate name.
Destination TypeDomestic, International or Custom classification.
Destination NameRequired for Custom destination setup.
CurrencyAllowance currency; must match the claim.
Full Day RateBase allowance for a full day.
Half Day RateBase allowance for a half day.
Overnight LodgingAdditional lodging allowance when Overnight is selected.
IncidentalAdditional incidental allowance.
Effective From / ToTravel date validity.
ActiveCurrent availability.

How claims calculate

A Per Diem claim uses one detail line per travel date. The user selects Day Type, Overnight and a valid rate, and can enter a Meal Deduction where applicable.

The system calculates Base + Lodging + Incidental - Meal Deduction. Meal deduction cannot exceed the allowance before deduction, and the selected rate is snapshotted for historical explanation.

Good practice

  • Create separate rates when destination/currency or allowance structure is materially different.
  • Effective-date rate changes; do not overwrite a historical rate used by old claims.
  • Explain meal-deduction policy in Expense Policies/travel policy so users know when to reduce the allowance.

Related pages

Frequently asked questions

Can Per Diem be claimed without receipts?

That depends on the organization's Expense Category/Policy. Per Diem calculation and receipt policy are separate controls.

Why did Overnight change the amount?

When the selected rate contains an overnight lodging allowance, Overnight adds that configured component to the day's calculation.

Continue reading